Bulldogs News · North Dallas renovation project: Swimming pool bleachers, walls are coming down


A side view of the pool bleachers.

The bleachers in the swimming pool area are being removed. They are not that thick.

You can see a little bit of the basement below the bleachers.

The pool walls have been removed. The entrance to the basement can be seen on left side. The floor will be extended across, and over the basement, for the new kitchen area of the lunchroom.

New air conditioning pipes.

The air conditioning unit can be seen in the hole in the above right corner.

The door entrance to the basement.

Another view of the walls being removed and you can see the area behind the pool.

The stairwell to the basement.

The entrance leading into the pool area.

The existing and new design for first floor. On right side, you can see where kitchen area is being extended and dining room area will be expanded.

 

ndhsbulldogathletics.com is a North Dallas High School Booster Club website. The website is maintained by the NDHS Booster Club and is not part of the North Dallas High School or the Dallas ISD. Neither North Dallas High School nor DISD is responsible for the content of this website or the content of links external to this website.